Typical Clean Room Maintenance Tasks

  • 2024-01-30
  • View 21

Whether it's a biotechnology or a semiconductor application, regular and proper HVAC preventive maintenance on clean rooms is absolutely critical.

Depending on that application, one of several classes of clean rooms can be specified. This, in turn, will determine the amount of the room's needed filtration and air changes. These classes are shown in Table 1. Since all clean rooms run 24 hours a day/ 7 days a week, typical clean room maintenance tasks can be separated into two parts: filter maintenance and equipment maintenance.

Purification Projects In Other Industries (10)

Clean Room Filter Maintenance

Filter maintenance is a key part of clean room support and critical to keep the room within specification. The 24/7 operation of the room puts continuous flow through the filters, causing them to foul faster than equipment that runs on a time schedule.

All clean rooms use HEPA filters for the final cleaning of the conditioned air into the space. These are usually preceded by high-density (magnehelic metered) bag (or box) filters, which are then preceded by pre-filters.

Because HEPA filters are expensive and timeconsuming to replace, it's imperative to be diligent in the maintenance of the bag (or box) filters that protect them. Since the bag (or box) filters are somewhat expensive as well, it's also important to frequently replace the pre-filters that protect the bag (or box) filters.

A typical minimum filter replacement schedule for a clean room could be the following:

Pre-filters — Six times per year

Bag filters — One time per year

HEPA filters — Once every three years.

This schedule may need to be adjusted for any particular clean room, as a result of the percentage of outside air that's introduced into the system, as well as the geographic or physical location of the building.

Often, the frequency of changes is influenced by nearby construction, proximity to freeways, as well as fog or other climate-related conditions.

However, because the building was next to a freeway, it was subjected to dust and debris. It was also next to commuter railroad tracks, where diesel smoke was a constant issue. To add yet another factor, the climate was very foggy. To counter all of these factors, we upgraded the bag filters to a box type (photo 3).

When quoting the maintenance for this building, we only included the prefilters on the bi-monthly changes, with the post filters being changed on an as-needed basis extra to the contract. This was also due to the fact that we didn't yet know the personality of the building.

Clean Room Equipment Maintenance

Clean Room Maintenance on any non-redundant clean room equipment will usually require a planned shutdown. This allows a technician the time necessary to thoroughly inspect such things as the belts, sheaves, and bearings.

It's a good idea to keep a spare parts inventory on hand so replacement of a worn belt or contactor can be accomplished without a subsequent interruption to the operation of the room.

The frequency of this work is best scheduled with the pre-filter maintenance, but is often times dictated by the clean room's restrictions.

Some Final Thoughts

The key to providing maximum reliability with a minimum of shutdowns is a good preventive maintenance program.

The first year of a clean room maintenance contract will usually reveal the personality of a particular building in both filter and equipment frequencies.

Monitoring how dirty the pre-filters are during service, and the changes in magnehelic readings on the bag (or box) filter housings, will ultimately determine the actual frequency of the filter changes.

In addition, working closely with the occupants of the clean room, as well as the facilities personnel, will help you discover the needed frequency of the equipment maintenance.

Kwang Cleanroom is proud to offer examples of a variety of our cleanroom projects below. Electronics Assembly Cleanrooms, Cosmetic Production Cleanrooms, Automotive Cleanrooms, Aerospace Cleanrooms, Medical Device Cleanrooms, Pharmaceutical & Biotechnology Cleanrooms, Powder Coating Cleanrooms.

cache
Processed in 0.005513 Second.